How to Install Roll Roofing
Roll roofing is one of the most affordable ways to protect a low-slope or shed-style roof. Also called mineral-surfaced roll roofing, it comes in long strips that overlap and are fastened directly to the deck. The job is manageable for a competent DIYer with basic roofing tools and a helper to handle the heavy rolls. Success depends on dry weather, a clean surface, and careful attention to alignment and nail placement. The following guide walks through preparation, layout, cutting, fastening, and finishing details so the roof sheds water reliably for years.
More from this site
Keep reading the latest coverage
Gather Tools and Materials
Before you begin, confirm you have everything on hand. Missing a single item mid-project means stopping work while the weather can still change. The essential list includes the roll roofing itself, roofing cement or adhesive, galvanized roofing nails or cap nails with washers, a utility knife with fresh blades, a chalk line, a tape measure, a straightedge or chalk reel, a roofing shovel or scraper, a power drill with a roofing bit, safety harness and rope, and a ladder rated for your weight plus materials. Check the manufacturer's specification sheet for the recommended nail length and spacing for your particular product, because variations exist between brands and weight classes.
Inspect and Prepare the Roof Deck
The deck must be dry, clean, and structurally sound. Remove any old roofing material down to the bare decking, using a roofing shovel to scrape off loose debris and built-up layers. Inspect the decking for rot, sponginess, or cracks; replace any damaged sections with new plywood or oriented strand board that matches the existing thickness. Sweep the entire surface, and pressure wash if there is moss or heavy dirt. Let the deck dry thoroughly. Most manufacturers require a minimum deck temperature, often around 40°F (4°C), and strictly prohibit installation during rain, snow, or high humidity. Working on a damp deck is the fastest route to premature leaks and adhesive failure.
Plan the Layout and Course Direction
Roll roofing typically runs horizontally, with each successive course overlapping the one below. Start at the lowest edge of the roof and work upward so water flows over the overlaps rather than underneath them. Snap a chalk line parallel to the eaves for the first course, and verify the line is square to the eaves using a framing square. If the roof has a valley or a ridge, plan your starting point so you avoid stepping seams directly over valleys where water concentrates. Measure the full length of the roof from eave to ridge, adding a few extra inches for the starter strip that will fold over the rake edge.
Cut and Lay the First Course
Unroll the first strip along the chalk line and leave a small overhang at the eaves so water drips freely into the gutter instead of back under the roofing. Use a straightedge and utility knife to cut the material to length, making sure the cut is square so courses line up cleanly. For the starter course along the eaves, you may need to trim the top edge so the mineral surface does not extend over the eaves and interfere with water flow. Apply a continuous bead of roofing cement along the backside of the overlap edge before pressing the next course down, then secure with nails spaced according to the manufacturer's recommendation — commonly 6 inches apart along the edges and in the center.
Fasten and Seal Each Course
Lay each subsequent course with the proper overlap, which is usually 3 to 4 inches depending on the product width. Position the nails in the overlap zone so they penetrate the course below and into the deck, but avoid placing nails so close to the edge that the strip tears. Use cap nails with neoprene washers for seams that will be cemented, or standard galvanized nails for courses that rely on cement alone. Run a bead of roofing cement along the overlap seam before laying the next course, and press it firmly into place with a roofing boot or weighted roller to ensure full contact. Work quickly so the cement does not skin over before the course is set.
Finish the Rake Edge and Penetrations
At the rake edges, fold the final course over so the mineral surface faces down, creating a clean drip edge. Secure it with nails and seal the fold with cement. Where pipes, vents, or skylights penetrate the roof, install roll-roofing boots or metal flashing and seal the base with roofing cement. Inspect the entire surface for missed nails, lifted edges, or thin spots in the cement, and press or re-nail as needed. Walk the roof gently with a soft-bristle broom to check for loose mineral granules, and sweep them back into place if they are still adhered enough to reuse.
Common Mistakes to Avoid
- Installing on a wet or frozen deck, which prevents proper adhesion and nail seating.
- Nailing too far from the overlap edge, which leaves the seam vulnerable to wind uplift.
- Using nails that are too short, so they do not penetrate the decking fully.
- Skipping the roofing cement at seams and relying solely on nails for waterproofing.
- Overlapping courses in the wrong direction, allowing water to creep under the shingles.
Maintenance After Installation
Inspect the roof twice a year, in spring and fall, and after any major storm. Look for cracked cement, displaced nails, and granules collecting in gutters, which signal surface wear. Clear debris from valleys and gutters promptly so water does not pond. Small cracks can be sealed with a patch of roofing cement and a scrap of roll roofing. If the roof shows widespread cracking or the mineral surface is heavily worn, it is time to re-cover or replace the material entirely.